United StatesChange

Andrew Ritosa

Engineer, Applications Engineering, Pentair
Find me on:

Recent Posts

3 Considerations to Maximize Grounding System Life

Posted by Andrew Ritosa on Dec 12, 2017 8:02:00 AM

While there’s no known solution to completely protect your facility from naturally occurring environmental threats, certain steps can be taken to minimize risk. These precautionary steps to total facility protection include the following concepts:

  • Direct strike protection
  • Grounding and bonding systems
  • Transient surge and over-voltage protection

To maximize both the effectiveness and service life of a grounding system, careful considerations must be followed. Read below to learn three considerations to keep in mind when installing your next grounding system.

Read More

Topics: Grounding System